    Has anyone had experience of a fast drying concrete, 100mm slab, which can be laid prior to tiling a wet room
    (Porcelain tiles over Marmox insulation board) floor. Needs to be quick drying.
    Someone’s mentioned Cemscreed which is a Tarmac product.
    Thanks
     
  2. Sponsored Links
  3. Ian H

    Ian H

    Joined:
    14 Sep 2010
    Messages:
    5,873
    Thanks Received:
    640
    Location:
    Rochdale
    Country:
    United Kingdom
    The quickest is the Extra Rapid in the yellow/green bags.
     
  4. mallyplumbob

    mallyplumbob

    Joined:
    21 Feb 2008
    Messages:
    171
    Thanks Received:
    5
    Location:
    Derbyshire
    Country:
    United Kingdom
    Hi Ian. Is that a concrete or adhesive.
    And what make.
     
  5. JohnD

    JohnD

    Joined:
    15 Nov 2005
    Messages:
    60,492
    Thanks Received:
    3,169
    Location:
    Dunfermline
    Country:
    Cook Islands
    do you mean quick drying? Because of damp?

    Or do you mean quick setting or quick curing, because of frost or need to walk on it after a few days?

    Concrete does not harden by drying.
     
    • Like Like x 1
  6. mallyplumbob

    mallyplumbob

    Joined:
    21 Feb 2008
    Messages:
    171
    Thanks Received:
    5
    Location:
    Derbyshire
    Country:
    United Kingdom
    Hi John.
    Quick drying. I need to put a new concrete slab down, 100mm approx and then fix the Marmox insulation board using tile adhesive, lay the Warmup heating element and then lay the porcelain tiles. I need the concrete slab to “dry” as soon as possible so that I can carry on with the rest of the procedure.
    I’ve been told a standard concrete mix would take 1 day per millimetre to dry.
    So I’m looking for a “quick drying” mix.
    Tarmac Cemscreed, which is added to the ballast/aggregate, instead of cement, apparently dries quicker than the standard mix.
     
  7. ^woody^

    ^woody^

    Joined:
    3 Sep 2006
    Messages:
    27,145
    Thanks Received:
    3,392
    Location:
    West Mids
    Country:
    United Kingdom
    You need to reduce the water content of the mix do that there is just enough to make it workable and for the cement to react.

    Cemscreed is for screed not concrete.

    There is a vacuum moisture extraction process for rapid drying of concrete, but that's probably a bit too extreme for a little wet room.

    You could add mesh to control cracking and then use fans or heat and ventilation.
     
  8. Ian H

    Ian H

    Joined:
    14 Sep 2010
    Messages:
    5,873
    Thanks Received:
    640
    Location:
    Rochdale
    Country:
    United Kingdom
    It's a cement available from any builders merchants. It sets fast but no idea about drying.
     
  9. mallyplumbob

    mallyplumbob

    Joined:
    21 Feb 2008
    Messages:
    171
    Thanks Received:
    5
    Location:
    Derbyshire
    Country:
    United Kingdom
    Ok thanks
     
  10. Sponsored Links
  11. JohnD

    JohnD

    Joined:
    15 Nov 2005
    Messages:
    60,492
    Thanks Received:
    3,169
    Location:
    Dunfermline
    Country:
    Cook Islands
    if your concern is damp concrete making the floor finish wet, apply a DPM over it.
     
  12. tomfe

    tomfe

    Joined:
    27 Aug 2014
    Messages:
    1,262
    Thanks Received:
    160
    Country:
    United Kingdom
    Why the rush?
    Concrete you can work ontop of concrete after a couple of days.
    If you use a flexible adhesive and grout and wait 7 days you should be fine.
     
  13. mallyplumbob

    mallyplumbob

    Joined:
    21 Feb 2008
    Messages:
    171
    Thanks Received:
    5
    Location:
    Derbyshire
    Country:
    United Kingdom
    I’m concerned about locking the moisture into the concrete slab.
     
  14. Blagard

    Blagard

    Joined:
    9 Feb 2010
    Messages:
    1,560
    Thanks Received:
    275
    Location:
    Leicestershire
    Country:
    United Kingdom
    Woody has already told you the most sound bit of advice - reduce the water content of the concrete. You can get concrete to set fast sure, but that is not dry fast. The water locked into the mix needs to work itself out, so the less you put in the less to evaporate. once the concrete has cured to a reasonable strength I would suggest a week, then put a heater and dehumidifier into the room to accelerate the drying out. The figures you have are for natural drying out. You may be able to decide when to carry on by the amount of water the dehumidifier collects each day. But if for instance you put heat and humidifier in too early, it could cause the concrete to crack because you have not given it enough time to cure. That is why contractors put mats over concrete in the summer, to keep the moisture in until the concrete has sufficiently cured.

    Since you are doing a wet room your grouts are going to be waterproof at least to some degree. So long as the title adhesive does not degrade with the dampness you lock in, you should be OK as the moisture will usually find a way out but over a much longer term. But I would still try assisting the initial drying out before doing the tiling
     
    • Thanks Thanks x 1
  15. JohnD

    JohnD

    Joined:
    15 Nov 2005
    Messages:
    60,492
    Thanks Received:
    3,169
    Location:
    Dunfermline
    Country:
    Cook Islands
    Why?
     
    • Like Like x 1
  16. badgeraudio

    badgeraudio

    Joined:
    30 Nov 2012
    Messages:
    25
    Thanks Received:
    1
    Location:
    Leicestershire
    Country:
    United Kingdom
    Could you not change the build up?
    Say 50mm celotex, then the warm up element. Then a 55-60mm screed then the tiles?
    you only have screed to go off then rather then the concrete and insulation board adhesive before applying the tiles..

    Note I am not qualified in any way but its what I would consider!

    Mike
     
  17. DIYnot Local

    DIYnot Local

    Joined:
    3 Sep 2019
    Country:
    United Kingdom

    If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

    Select the supplier or trade you require, enter your location to begin your search.


    Are you a trade or supplier? You can create your listing free at DIYnot Local

     
Sponsored Links
Loading...

Share This Page