I am new here, and I am hoping to find some help,as I am trying to sort my first flat (yep,a 100% naive newbie
)
I am having Aztec Trianco Classic 6KW electric boiler ,4 radiators with TVs,and Gainsborough shower 9.5 KW installed ,originally the price agreed included all additional materials ( I supplied boiler and installation kit for the boiler ,shower with RCD,rads with TVs.)
.
Now I am told they need RCD for the boiler as well,but when I offered to bring another of the RCD units,I was told that will be extra £50 for wiring it,or I need to buy one unit with 2RCD,for the shower and boiler.
I am quite confused about this, looking at the technical info for the boiler,it requires a RCD close to it,with a 30A MCB.
They offered to supply the double RCD for £30,and keep my shower RCD,but I am not sure ,as I am worried the boiler warranty may be compromised.
Any advice?
I am having Aztec Trianco Classic 6KW electric boiler ,4 radiators with TVs,and Gainsborough shower 9.5 KW installed ,originally the price agreed included all additional materials ( I supplied boiler and installation kit for the boiler ,shower with RCD,rads with TVs.)
.
Now I am told they need RCD for the boiler as well,but when I offered to bring another of the RCD units,I was told that will be extra £50 for wiring it,or I need to buy one unit with 2RCD,for the shower and boiler.
I am quite confused about this, looking at the technical info for the boiler,it requires a RCD close to it,with a 30A MCB.
They offered to supply the double RCD for £30,and keep my shower RCD,but I am not sure ,as I am worried the boiler warranty may be compromised.
Any advice?