agree ready pasted is pitttttts... I ignore that soak for 10 seconds crap.. and pull paper from bosh slowly onto paste boards, lay out and fold as if it has been pasted, then leave to soak for 4/5 min. usually goes ok then.. but wot a palarva....specially on 15ft drops..on staircases...
GRRRRR.......Turned up to a job (rained off outside) the bloke presented me with 10 rolls of doshi...... cuts paper, preps walls ..reads notice to decorator sheet supplied with box of paper... rushes out to get ready mixed (red top ) gets back after getting stuck 3/4 hr in traffic.. cut to the quick i pasted and sweated for 2/3 rolls thinking somthings not right here.. then decided to read label, not the instruction sheet i.e notice to decorator sheet which says used ready mixed paste and hang strait away... then sees labe in tiny writing ...PRE ENCOLE........ Duhh
How are we all anyhow ......

[/i]