If you read one bar on the boilers pressure gauge then you were presuriseing the whole boiler, you need the drain off open then take the pressure from the air valve with a tyre gauge,but if you have water at the air valve then the vessel is kaputt. Its a corgi job to replace it as the gas valve has to come out but its only a 45min job for a good eng.You can fit a 8lt expansion vess on the return ch pipe close to the boiler if you want a cheaper fix (but seal up the leaking air valve)
