I am trying to move a toilet from its existing position on an outside wall round 90degs to an internal wall. There is lots of room for all the bends and I will need 3 90deg bends to do this, but other than ensuring the fall is adequate, is there anything else I should look out for?
There is also a boss for connecting the basin waste along the straight run too.
This will all be boxed in, so 'pleasing to the eye' is not a restraint
There is also a boss for connecting the basin waste along the straight run too.
This will all be boxed in, so 'pleasing to the eye' is not a restraint
