I am in the process of a renovation and now moving on to the conversion of the garage which will become a habitable room.
In the garage is a manhole which I need to get agreement from the water authority to build over. My plans was to build up the manhole to floor level and double seal. The floor will be suspended. However from discussion with the water company they will not accept this and it is expected that they will request the removal of the manhole. I am hoping that they will be fine with this as there is a manhole 2m to 3 m to the right on the neighbours property so access is still possible.
Anyhow to cut a long story short what I am asking is that if the manhole is removed what is the process or what is the method statement to be provided to the water company. Unfortunately my drawings guy and builder are not being very helpful at this stage and I need to take control of the issue.
Any advice greatly appreciated.
Thanks
I am in the process of a renovation and now moving on to the conversion of the garage which will become a habitable room.
In the garage is a manhole which I need to get agreement from the water authority to build over. My plans was to build up the manhole to floor level and double seal. The floor will be suspended. However from discussion with the water company they will not accept this and it is expected that they will request the removal of the manhole. I am hoping that they will be fine with this as there is a manhole 2m to 3 m to the right on the neighbours property so access is still possible.
Anyhow to cut a long story short what I am asking is that if the manhole is removed what is the process or what is the method statement to be provided to the water company. Unfortunately my drawings guy and builder are not being very helpful at this stage and I need to take control of the issue.
Any advice greatly appreciated.
Thanks