I've had builders in to replace a cracked sewer pipe and they had to go through the kitchen floor - result being I now have a 3'x4' patch of fresh concrete somewhere between 4 and 8 inches deep in the corner.
Most of this will be underneath the kitchen units where I wont be laying the new solid wood floor, but about 18"x18" will be exposed and floored over.
Wisdom at these forums states 1 month per 1" of depth drying time before laying flooring over the top. Is there any way I can get around that, as I don't want to wait 8 months to lay the floor!