I have a sealed combi boiler system, and I would like to replace the whole bathroom suite and the radiator.
I keep reading that I should seek specialist help in draining down the system. I have drained an open system many times before, and removed rads for decorating and was thinking there can not be a great deal of difference, apart from the pressurization factor.
Once i have drained down the system I wish to remove radiators and put inline ball stop valves in the main Hot & Cold water lines to bathroom fittings.
Please Help
Ray Brooker
I keep reading that I should seek specialist help in draining down the system. I have drained an open system many times before, and removed rads for decorating and was thinking there can not be a great deal of difference, apart from the pressurization factor.
Once i have drained down the system I wish to remove radiators and put inline ball stop valves in the main Hot & Cold water lines to bathroom fittings.
Please Help
Ray Brooker