Hi there,
I know this may sound like a silly question to those of you in the know. But I have read through the Part P documents on the OPDM website and it is too technical for me to understand.
Here is the situation, I have a ring main servicing the bedrooms in my property and I wish to move a double socket outlet around 1m to its left. To do this I will need to replace a section of the Red & Black wiring with T+E 2.5mm of the harmonized type. Do I have notify the LABC? I understand that I will have to place a warning sign on the CU stating that there is two cabling versions of BS7671 etc etc....
Thanks in advance....
I know this may sound like a silly question to those of you in the know. But I have read through the Part P documents on the OPDM website and it is too technical for me to understand.
Here is the situation, I have a ring main servicing the bedrooms in my property and I wish to move a double socket outlet around 1m to its left. To do this I will need to replace a section of the Red & Black wiring with T+E 2.5mm of the harmonized type. Do I have notify the LABC? I understand that I will have to place a warning sign on the CU stating that there is two cabling versions of BS7671 etc etc....
Thanks in advance....
