I have a switchmaster sm300 which controls the heating for my swimming pool.
Has 3 settings - Timer, Off and Constant.
The switch works fine however i wish to replace it with a Hive (if possible).
I have HIVE which controls my central heating.
The swimming pool heats via a heater exchanger linked to the same boiler.
Question:
I am not sure about the wiring but how difficult will it be to remove SM300 and replace with Hive?
My current Hive is Active heating (not active heating and hot water). Do i need 2 hives or should i replace my current one?
As i basically need a smart on/off switch is it possible to link it to a smart plug?
Has 3 settings - Timer, Off and Constant.
The switch works fine however i wish to replace it with a Hive (if possible).
I have HIVE which controls my central heating.
The swimming pool heats via a heater exchanger linked to the same boiler.
Question:
I am not sure about the wiring but how difficult will it be to remove SM300 and replace with Hive?
My current Hive is Active heating (not active heating and hot water). Do i need 2 hives or should i replace my current one?
As i basically need a smart on/off switch is it possible to link it to a smart plug?
Last edited: