I'm having a new resin driveway installed. The brick borders are going up quite high to the plinth level of front of house. Should the brick borders be further below 150mm for dpc purposes? Does the plinth I have offer any protection for damp?
Also the acro drain is there as I have a slope on the driveway going down slightly to the front door, hence the aco is there. They connected it to a soakaway in the middle of drive. Would you say aco drain is positioned in driveway correctly or should it be nearer door?
Also lastly I opened the aco drain cover and neither sides have end caps, is this a issue even when having a resin driveway installed?
I can probably get changes made as resin has not been laid yet...
Also the acro drain is there as I have a slope on the driveway going down slightly to the front door, hence the aco is there. They connected it to a soakaway in the middle of drive. Would you say aco drain is positioned in driveway correctly or should it be nearer door?
Also lastly I opened the aco drain cover and neither sides have end caps, is this a issue even when having a resin driveway installed?
I can probably get changes made as resin has not been laid yet...