Routine for installing new bathroom suite

Joined
12 Apr 2010
Messages
12
Reaction score
0
Location
Bristol
Country
United Kingdom
Hi all,

I have totally stripped the bathroom now and jobs to do are:

Make platform for shower (so drainage pipes can be installed and hidden).
Tile walls
Tile floor
install appliances.

I know the platform issue will need to be resolved first but do not know what to do after. Do appliances normally go in before the tiles so the tiler will know how to cut around the pipework etc when installing tiles?

Thanks
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top