RWB9 Programmer

Joined
20 Dec 2006
Messages
11
Reaction score
0
Location
Berkshire
Country
United Kingdom
I replaced my Switchmaster programmer with a Siemens RWB9. Had both heating and water working ok until I changed to 5/2 days from 7 days. Now the only way I can get heating to work is by removing motorised valve head and operating manually. Please help
 
Sponsored Links
does it work if you select advance or +1 hour on the heating side. is the hot water side working ok? is your system a "S" plan or "Y" plan. oh, a quick one. is the clock set for pm instead of am. (i made the same mistake 2 weeks ago on a rwb7 :oops: )
 
what happens if you adjust it to how it was, before you adjusted it to how it is?

I am wondering has the valve gone phizz phizz zap, dead
 
Sponsored Links
right, you have power running through the rwb9. first thing to check is a switched live coming out of the "HTG" terminal when you select for heat.
http://content.honeywell.com/uk/homes/Catalogue/Sundial Plans/3.4 Y Plan.pdf this is the wiring for the "Y" plan system. also make sure the room stat is calling for heat. (sorry to state the obvious) also try setting the nibs back to 7 day programmer to see if it works.
 
If I could remember what it was to start with I'd be laughing instead of crying !!!
The valve will only switch back to water only. If I turn it to heating it just reverts back to water mode.
 
is the 3 port valve ahoneywell item i think they are set in the position to give priority to hot water when not powered up.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top