Hi,
We are converting a basement area into a flat, we've exhausted all option to reach traditional drains so have to go saniflo.
Building Regs are saying if we do so we'd need to provide a 24hr stroage container in case the power goes off.
Has anyone else had this stipulation ? I can see the point but come on 24hrs ???.....who's going to sit in a flat for 24hrs with no power if they need the toilet !!
What options do we have here ? - i really dont want to break into the slab so it will have to be something on the floor somewhere.
tia,
Mike.
We are converting a basement area into a flat, we've exhausted all option to reach traditional drains so have to go saniflo.
Building Regs are saying if we do so we'd need to provide a 24hr stroage container in case the power goes off.
Has anyone else had this stipulation ? I can see the point but come on 24hrs ???.....who's going to sit in a flat for 24hrs with no power if they need the toilet !!
What options do we have here ? - i really dont want to break into the slab so it will have to be something on the floor somewhere.
tia,
Mike.