Please could someone sanity check this for me.
Three valve, S Plan system. Image is the backplate of the current Hive Receiver which controls heating (Downstairs) and Hot Water.
So the live wires, of which there are three, should be seperated and and connected to Live, 2 & 5.
3 & 4 (NO) need to go to 3 & 6 on the Heat Link.
Job done?
Three valve, S Plan system. Image is the backplate of the current Hive Receiver which controls heating (Downstairs) and Hot Water.
So the live wires, of which there are three, should be seperated and and connected to Live, 2 & 5.
3 & 4 (NO) need to go to 3 & 6 on the Heat Link.
Job done?