Hi.
We are currently doing the bathroom up and laying porcelain tiles on the floor but have found the floor not level by approx 10mm over 600mm length. We have PVA bonded the floor and layed screed - we had to put a second coat on top of the first but the second coat was a lot runnier - is this going to cause any problems???
Thanks
We are currently doing the bathroom up and laying porcelain tiles on the floor but have found the floor not level by approx 10mm over 600mm length. We have PVA bonded the floor and layed screed - we had to put a second coat on top of the first but the second coat was a lot runnier - is this going to cause any problems???