Screed on split level floor

Joined
7 Sep 2009
Messages
23
Reaction score
0
Country
United Kingdom
We have just dug out our basement, with a split level where one area is 600mm above the other. We plan to put a glass balustrade up to partition the two areas apart.

The 2 concrete slabs have been laid, and now the cavity membrane is on, but how will they pour the screed? Do I need to do some shuttering? Or is there something else someone can suggest?

A builder suggested that the screed might just crumble if it went right up to the edge before dropping off.

I guess this is no different to screeding a landing area upstairs. How do you go about this?
 
Are there going to be steps where there is a change in levels?

What is happening with the 600mm visible chunk of vertical floor?
 
Are there going to be steps where there is a change in levels?

What is happening with the 600mm visible chunk of vertical floor?

There will be time steps leading up. But the remaining vertical will be plastered and finished with a bannister rail.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top