We have just dug out our basement, with a split level where one area is 600mm above the other. We plan to put a glass balustrade up to partition the two areas apart.
The 2 concrete slabs have been laid, and now the cavity membrane is on, but how will they pour the screed? Do I need to do some shuttering? Or is there something else someone can suggest?
A builder suggested that the screed might just crumble if it went right up to the edge before dropping off.
I guess this is no different to screeding a landing area upstairs. How do you go about this?
The 2 concrete slabs have been laid, and now the cavity membrane is on, but how will they pour the screed? Do I need to do some shuttering? Or is there something else someone can suggest?
A builder suggested that the screed might just crumble if it went right up to the edge before dropping off.
I guess this is no different to screeding a landing area upstairs. How do you go about this?