I'm renovating a 6th floor council flat. The darned thing has cement floors.
The floor is actually 4 inches lower where the walls are. In some of these gaps, there are conduit pipes, etc. I don't want to fill these sections with self-leveling compound.
What's the best way to make sure self-leveling compound doesn't leak through these gaps and fill these rather large spaces?
Not sure if this makes any sense.