If installing a unvented cylinder your requirement is to run 2 showers together?, you will still need a CWST IMO with a single ended pump as difficult to imagine a mains supply of ~ 30LPM @ say 2.0/2.5bar dynamic pressure.I didn't know what a Jab was so had to look it up
From reading other threads Joule seems to crop up quite often as a recommendation.
I've got in touch with the chap who replaced the boiler 6 Months ago, to see if he would be prepared to carry out the works.
