Hello
I just wanted to clarify a few things when installing a shower feed, it will be Part P certified etc etc
When i install the 10mm T&E from an RCD protected CCU do i have to run a seperate bonding earth cable along side it to run from the shower earth terminal back to the CU? If so why? because i am already attaching the earth from the T&E to the earth terminal at the Shower running back to the CU
Many thanks
I just wanted to clarify a few things when installing a shower feed, it will be Part P certified etc etc
When i install the 10mm T&E from an RCD protected CCU do i have to run a seperate bonding earth cable along side it to run from the shower earth terminal back to the CU? If so why? because i am already attaching the earth from the T&E to the earth terminal at the Shower running back to the CU
Many thanks