Hi guys,
Fitting a shower tray with a new stud wall with aqua panel...
Would you raise the aqual panel to sit onto the tray then tile
or aqua panel first then tile to the tray
Also im using a tanking kit, would you tank onto the shower tray and tile over? how much overlap would be needed?
Thanks guys