Then the rest of the work and the lights are two separate jobs, payable for separately, certifiable separately, and if notifiable, then notifiable separately.What is not finished is replacing two lights outside with a different type.
In the contract he stated that the price did not include these.
That probably depends on how much fuss you make, and how prepared you are to escalate, go to court etc.Can I ask you what happens if a contractor is reported to the scheme for not notifying?
By all means, but I don't know what I can tell you that I haven't here....Bas can i contact you via email?
Also on this rewire, 16 downlights have been wired into terminal blocks some wrapped in brown tape and some not, in Part P Doctor Alan says that all connections must be enclosed ie choc box. dread to think what else i will find next. Oh, and i have had a belt from a power tool plugged in d/stairs ring.
. Oh, and i have had a belt from a power tool plugged in d/stairs ring.
It's nothing to do with Part P.
committing an actual criminal offence.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local