Soakaway and drainage pipes - what do BC want to see?

Joined
29 Jan 2008
Messages
2,051
Reaction score
413
Location
Liverpool
Country
United Kingdom
Been digging today, got my Soakaway installed and some of the trenches for the sewerage pipes...but what will BC want to see in terms of stage of completeness.

For the pipes I was going to put the pea shingle in and then actually run all the pipes and manholes, but not cover them over.

For the Soakaway I’m not sure if I should backfill the sides and leave just the top exposed, or just leave it without any back fill?

Id welcome any advise please?
Thanks
Andy

7EC37F40-7F73-4833-BD1E-50ACA09D7B9F.jpeg
7EC37F40-7F73-4833-BD1E-50ACA09D7B9F.jpeg
 
Sponsored Links
BC will want to see the soakaway hole and the pipework leading to it, with the pipework half submerged in pea gravel.
 
They would want to see the depth, plus the width and length, possibly the ground stratas before you add the anti silting layer, the pipes laid and bedded (but not covered), and the pipe entry and discharge point.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top