I'm putting in a down stairs toilet, and it will be about 4/5 meters from the soil stack. The house has a cellar, and i think that their is drainage below the level of the cellar floor outside the house, Am I OK to extend the ground work underneath the cellar floor to below where the new toilet is going to go, so that i can just go straight down from toilet in to the new drainage. And also will I have to get inspected by a building inspector? Cheers bob
