I'm in the process of installing an Inspection chamber...going well so far but i'm wondering about the soil pipe connection...the pipe runs approx 1.5m from the chamber, then i've got a bend to take it to the surface (brown plastic pipe). This is an adjustable bend with female connectors at each end. I'm planning on positioning it so that the top opening is at surface level, so that i can concrete flush to it and install soil pipe. Is this ok? or should i lower it fully underground, fit soil pipe then cement? or any other ideas? My thinking is that if the connection is flush to the surface then i can can access/replace soil pipe easily should i need to.
Thanks
Thanks