Hi all
Can anyone tell me the regs on splitting the supply I require to provide a supply to an self contained extension consisting of cooker, shower, kitchen ring, and lighting circuit. I have considered splitting the supply before the main CU and then supplying both CU,s via a henly block also would it be in order to run the main earth conducter from extension back to the MET in the main CU, or is there a better way, perhaps a complete fused service head and PME it
Mac
Can anyone tell me the regs on splitting the supply I require to provide a supply to an self contained extension consisting of cooker, shower, kitchen ring, and lighting circuit. I have considered splitting the supply before the main CU and then supplying both CU,s via a henly block also would it be in order to run the main earth conducter from extension back to the MET in the main CU, or is there a better way, perhaps a complete fused service head and PME it