got a swa cable run to do from a 3 phase board to supply a single phase submain.
the new submain point however will be in a different building to the 3 phase db. its not feesible to bury the cable as per usual but cant find anywhere in the regs referring to running the cable overhead.
the plan is to run a steel conduit from one building to the next and draw some swa through that. the gap between buildings is only a couple of meters and not a pathway or anything.
does anybody know the regs regarding this (minimum height?) or can offer any views on this?