I am at the stage of my new extension whereby I now need to commission my new Alpha condensing system boiler, this boiler, with integral pump, is situated in the new utility room adjacent to the kitchen where my original boiler is. Original system is Y plan fully pumped, boiler is Halstead, cyl stat is Drayton HTS3, pump (will be taken out) is Flowson 25-50, 3 port valve by Ikon, room stat is dial type and wiring center is Landis & Gyr and the programmer is 2 channel RWB9 by Wickes. The Alpha needs 2 feeds, one permanent, for pump over run, and one switched, the permanent live is not a problem, I can sort that, its the switched live I cant suss out, am I right in thinking that this can picked up from the wiring center with 4 core, if so which terminals do I connect to. The Alpha does not have a system clock fitted (optional).