- Joined
- 17 Feb 2006
- Messages
- 373
- Reaction score
- 1
- Country
I'm going to tile round the bath, which will also have an overbath shower.
I'll set out so that there's an approximate half tile cut in the corner, and then go to the first full tile beyond the bath edge.
I plan to use tanking membrane. As I know exactly where I'm going to start (talking about vertically) is there any reason I can't do tanking membrane to exactly that point?
I'll finish with tile edge strip, so presumably I'll just have a slightly thicker grout line between the wall and the strip?
Thanks.
I'll set out so that there's an approximate half tile cut in the corner, and then go to the first full tile beyond the bath edge.
I plan to use tanking membrane. As I know exactly where I'm going to start (talking about vertically) is there any reason I can't do tanking membrane to exactly that point?
I'll finish with tile edge strip, so presumably I'll just have a slightly thicker grout line between the wall and the strip?
Thanks.