I have read on here that a bath should be installed against the wall then tiles after so that water can run down into the bath (like you would install a shower tray). However, I'm installing a bath and if I do that it would be impossible (I think) to fit the bath panel as it needs to pull out sideways (a cheapy acrylic one). Same goes for the floor tiles - if I tile up to the bath panel it won't pull out at the bottom so that it can be removed. Can anybody point me in the right direction. I'm thinking tile the floor and walls then install the bath but that goes against what I keep reading.