Tiling bathroom shower

Joined
3 Feb 2025
Messages
34
Reaction score
1
Country
United Kingdom
Hi All

So I’ve gotta re tile this shower in my bathroom starting from what what’s left on the wall and continuing down the bottom.

I’m not sure where to start really. Do I do all the middle tiles 1st or the edges? Any hints and tips to make it easier as I’ve never done tiling in my life.. how do I work out what size tile spacers I need?

Thanks
Tom
 

Attachments

  • IMG_0757.jpeg
    IMG_0757.jpeg
    653.3 KB · Views: 17
Are you over tiling with the dark grey ones? Do the middle ones first and then cut the sides to fit.

Spacers - match the existing, looks like 2mm. Looks like there is still one in the joint of that last tile, dig it out and buy some the same
 
Hi
Yeah over tiling the white ones with the darker ones. Can I do the middle then let it dry and then do the sides? Guess I just clean the tile adhesive away from the edges of the middle ones ready for the sides when I do them?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top