Hi all,
I'm thinking about making a box frame (tiled finish) at the end of the bath tub. Just wondering if its best to:
A) tile the whole wall first, then make the box and tile up to the wall. (so tiles would be running behind/inside the box)
or
B) do the box first and then the wall tiles up to the box. In this option, do I tile the box first or wall first?
I'm thinking about making a box frame (tiled finish) at the end of the bath tub. Just wondering if its best to:
A) tile the whole wall first, then make the box and tile up to the wall. (so tiles would be running behind/inside the box)
or
B) do the box first and then the wall tiles up to the box. In this option, do I tile the box first or wall first?

