.....bit of a long story, but a surveyor on a job that we are on has made an incorrect measurement and as such our 8x2 timber span is now well over the max span according to the tables.
The clear span we need to make is 4500mm. UNfortunately the 8x2 is in place at 400 c/c. I wondered if we doubled up the timbers if that would make it pass?
Any thoughts please? (there has been a suggestion of plywood bracing as well?
The clear span we need to make is 4500mm. UNfortunately the 8x2 is in place at 400 c/c. I wondered if we doubled up the timbers if that would make it pass?
Any thoughts please? (there has been a suggestion of plywood bracing as well?