Ive recently installed an RSJ which sits on two steel posts. One of these posts sits on the top of my celler wall.
I want to lower my celler floor and therefore do some underpinning. I will do this at a later date, but for now I'd like to just do the section under the steel beam load as I have acrow props up so want to do just this bit now.
My celler is about 6ft hight from earth floor to ceiling joist. I would like about 7 or 8 ft ceiling height eventually
My question is what is the requires footing I need to dig below my new floor level? I've read in new houses it's a meter but that would mean I have to dig down about 1-2ft initially (to get to the new floor level) then another meter for the new footing.
Is this correct? [/list]
I want to lower my celler floor and therefore do some underpinning. I will do this at a later date, but for now I'd like to just do the section under the steel beam load as I have acrow props up so want to do just this bit now.
My celler is about 6ft hight from earth floor to ceiling joist. I would like about 7 or 8 ft ceiling height eventually
My question is what is the requires footing I need to dig below my new floor level? I've read in new houses it's a meter but that would mean I have to dig down about 1-2ft initially (to get to the new floor level) then another meter for the new footing.
Is this correct? [/list]