Hi. Got someone in to do the bathroom. Could anyone give me some opinions on the tiling so far.
Top left tile fell off soon after guy finished and went. Middle one I tried to move after about 5 hours and came off without much effort. Last one on row I was also able to remove without much effort after 18 hours.
1. Does the tile need a good amount of coverage of adhesive? Won't dot and dab cause problems?
2. Should surface should be clear and not free from old materials that could peel?
3. Should the shower area be tanked?
4. Should the gaps at each end of the shower tray meet the wall or can they be filled with silicone and expanding foam?
Thanks
Top left tile fell off soon after guy finished and went. Middle one I tried to move after about 5 hours and came off without much effort. Last one on row I was also able to remove without much effort after 18 hours.
1. Does the tile need a good amount of coverage of adhesive? Won't dot and dab cause problems?
2. Should surface should be clear and not free from old materials that could peel?
3. Should the shower area be tanked?
4. Should the gaps at each end of the shower tray meet the wall or can they be filled with silicone and expanding foam?
Thanks
Last edited: