Vented or pressure sytem

Joined
27 Jan 2004
Messages
221
Reaction score
1
Country
United Kingdom
I currently have an open vented hot water system on a total control/total heating tariff.

The current set up will be moved in the future to the extension that is currently under construction.

Problem being the roof trusses are soon to go up therefore the cold water tank would need to be placed up there before the gable end panels are fitted.

Is now the time to switch to a pressurized system (megaflo or similar) or stick with the vented system?

Just wondering what the professionals would recommend?[/i]
 