had a 3 phase meter changed at a block of flats i maintain after the guy had finished 2 of the mcbs would not reset he then removed fuseboard cover and said to maintenance guy that there was a loose neutral in fuseboard.after he had left site it was noted that across 2 phases the electronic equipment in 7 emergency light fittings a door entry system and an aov smoke system did not function
could this be down to a loose neutral in board
what else do you think could have caused all electronic components to cease working.
could this be down to a loose neutral in board
what else do you think could have caused all electronic components to cease working.
