hi all.
i have a a section of house wall that needs rendering. roughly 2M X 8M
the house is fully render except for the gable side where it is only rendered on the ground floor.
the render was in a real state so it was removed.
the render came off well but revealed the brickwork beneath to be 90% blown bricks. some upto 40mm back from the face.
do i go round filling all the holes/blown brick in first. in stages, slowley getting it back to level? what the maximum depth i can have of render? i think its going to need 4 coats of so to get nice and flat.
also what sort of time should be left in between coats?
thanks for all your help
ian
i have a a section of house wall that needs rendering. roughly 2M X 8M
the house is fully render except for the gable side where it is only rendered on the ground floor.
the render was in a real state so it was removed.
the render came off well but revealed the brickwork beneath to be 90% blown bricks. some upto 40mm back from the face.
do i go round filling all the holes/blown brick in first. in stages, slowley getting it back to level? what the maximum depth i can have of render? i think its going to need 4 coats of so to get nice and flat.
also what sort of time should be left in between coats?
thanks for all your help
ian