I've not done tiling in large amounts before. I am attempting a whole room and floor. The question is do i need to leave any form of gap at the ceiling or floor join to allow for any wall tile expansion etc. Its a bathroom so will be hot/cold and damp.
Also, the ceiling is getting re-plastered/artexed. Do i need to wait for this to be done before laying the wall tiles, or can the tiles be layed up to the existing ceiling and then the top edges covered with the new slightly lower ceiling level? Would that be ok
Hope that all made sense.
Thanks
Also, the ceiling is getting re-plastered/artexed. Do i need to wait for this to be done before laying the wall tiles, or can the tiles be layed up to the existing ceiling and then the top edges covered with the new slightly lower ceiling level? Would that be ok
Hope that all made sense.
Thanks