I'm all for new ideas.
Better by design and all that.
But... Unless you can convince a manufacturer (or go into production yourself) it will go the way of most good ideas... Nowhere I'm afraid!
I've spent enough hours winding ptfe - 40 tails on one job last week! So would have loved to have not had to do that!
20 wraps of normal ptfe for me... To guarantee no leak and to still look good!
I've tried gas ptfe and 55 but not honed that skill yet to do it without thinking... See how hard it is for a plumber to learn new habits! Lol.
I'd be interested to see your design drawings and understand if the tail is the same material as the rad so is it in the casting or a different metal?
Good luck