I'm converting a 2 storey building into 2 one bed flats (7.5m X 6m) each. I've put together a plan for the electrical fittings.
A combination of limited time and need to keep the building regs man happy will mean I will pass this one onto the pro's.
All cable work will be through new timber studs(no plasterboard) and a sustended ceiling. Plumbing will be in Hep20 plastic pipe (no earth bonding?). The building is vacant and empty i.e. no furniture.
So how long should it take a pro to wire up two identical flats?