Ive got down to the last two rows of the flooring in one of the bedrooms. ive staggered the joints throught out to at least 300m. MY problem now is that ive end up with less larger pieces and i cant acieve the 300ml stagger for 3-4 pieces. Does this really matter? DO you suggest i take up the flooring, or just carry on.
