I'm having a wetroom installed as an en-suite to an upstairs bathroom, are there any Part P's out there to advise as to how the earth bonding for lights/pipes etc should be carried out ?
My builder is saying that it should be 4.5mm earth wire, linked to everything and taken back to the "main water pipe". But i have seen it written on here that often the earth should be wired into a socket for a special zone, and also that earth should be taken back to the MET but never that it should go to the (already earthed) water pipe.
Also, how should the shaver point and extractor be earthed?
I will have a Part P sign this off, but i'd be grateful of some info in the mean time please, to save changing incorrectly done work.
My builder is saying that it should be 4.5mm earth wire, linked to everything and taken back to the "main water pipe". But i have seen it written on here that often the earth should be wired into a socket for a special zone, and also that earth should be taken back to the MET but never that it should go to the (already earthed) water pipe.
Also, how should the shaver point and extractor be earthed?
I will have a Part P sign this off, but i'd be grateful of some info in the mean time please, to save changing incorrectly done work.
