convert

Status
Not open for further replies.
nobody mentioned a power flush, fannybaws

a "system clean" will be a requisite of the manufacturers warranty

and that £20 for inhibitor has come out of your £350 profit, btw us RGIs
pick up that stuff for £7
well done sharky its all about who you no in this game hoe do you rate the ferrolli 31c ?
 
Sponsored Links
A few hours!? Should take all day, at least, sometimes more. Have you included cleaning and flushing the system in your price? Do TRVs need changing/adding? Is there a roomstat, and if so is it in working order? If it isn't present/working, have you included installation of this in your price?
no room stat, the customer does not want power flush other wise i would of added another 350 muggsy lad. The trvs are in good working order just had new ones to every rad. Yes afew hours like i said its like for like swop gas floe and return all in 22mm 3 metres to and from boiler its a ideal boiler thats there now incidently

I never said a POWERflush, just a clean and flush, IE chemicals and flush with clear water, this is the very minimum that is required, and not doing it will invalidate the warranty
 
Sponsored Links
no room stat, the customer does not want power flush other wise i would of added another 350 muggsy lad. The trvs are in good working order just had new ones to every rad. Yes afew hours like i said its like for like swop gas floe and return all in 22mm 3 metres to and from boiler its a ideal boiler thats there now incidently
I am sure your inspector will be well impressed with such a fine job. Don't forget to explain to him that you got your knowledge from an internet course; if you had done it properly, he would expect you to do a decent job.
 
FFS - how the hell did you build a portfolio of jobs and learn nothing about installing boilers.

"Customer didn't want a roomstat" - How are they going to control their CH then, or didn't you explain that to them?

Good luck on your inspection mate, you'll need it
 
no room stat, the customer does not want power flush other wise i would of added another 350 muggsy lad. The trvs are in good working order just had new ones to every rad. Yes afew hours like i said its like for like swop gas floe and return all in 22mm 3 metres to and from boiler its a ideal boiler thats there now incidently
I am sure your inspector will be well impressed with such a fine job. Don't forget to explain to him that you got your knowledge from an internet course; if you had done it properly, he would expect you to do a decent job.
i spoke to a 14 year old boy quote boy he said he got abuse on this site i bet you was one of the saddos glasgow gas i thought it was all lpg up there ..........................
 
FFS - how the hell did you build a portfolio of jobs and learn nothing about installing boilers.

"Customer didn't want a roomstat" - How are they going to control their CH then, or didn't you explain that to them?

Good luck on your inspection mate, you'll need it
thanks lad
 
FFS - how the hell did you build a portfolio of jobs and learn nothing about installing boilers.

"Customer didn't want a roomstat" - How are they going to control their CH then, or didn't you explain that to them?

Good luck on your inspection mate, you'll need it
thanks lad

He's hinting that you'll need a roomstat to comply with building regs, something you should have learned on your Energy Efficiency course
 
FFS - how the hell did you build a portfolio of jobs and learn nothing about installing boilers.

"Customer didn't want a roomstat" - How are they going to control their CH then, or didn't you explain that to them?

Good luck on your inspection mate, you'll need it
thanks lad

He's hinting that you'll need a roomstat to comply with building regs, something you should have learned on your Energy Efficiency course
BG ?
 
FFS - how the hell did you build a portfolio of jobs and learn nothing about installing boilers.

"Customer didn't want a roomstat" - How are they going to control their CH then, or didn't you explain that to them?

Good luck on your inspection mate, you'll need it
thanks lad

He's hinting that you'll need a roomstat to comply with building regs, something you should have learned on your Energy Efficiency course
BG ?

"BG?" What the hell are you on about, BG? No idea what this is supposed to mean, but it certainly hasn't adequately responded to my post
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Status
Not open for further replies.
Sponsored Links
Back
Top