hi
just had new boiler fitted and all kitchen plumbing updated but the gas engineer/plumber didnt rreplace the earth bonding , first question is should he have done this? second is whats required as i understand it. it is 10mm2 earth cable wich must be connected to the gas pipe on service side within 600mm of entry to the house and the routed to the consumer unit and also the water main has to bonded which is right next to the gas pipe ,can you bond bond this to the gas pipe or does this also have to be routed to the consumer unit as a seperate run
thanks
dino
just had new boiler fitted and all kitchen plumbing updated but the gas engineer/plumber didnt rreplace the earth bonding , first question is should he have done this? second is whats required as i understand it. it is 10mm2 earth cable wich must be connected to the gas pipe on service side within 600mm of entry to the house and the routed to the consumer unit and also the water main has to bonded which is right next to the gas pipe ,can you bond bond this to the gas pipe or does this also have to be routed to the consumer unit as a seperate run
thanks
dino