We all know how it works...
800amp fuses protecting a busbar, and then 16, 25, 35 mm etc feeding 63amp, 100amp etc switch fuses bushed onto the busbar chamber.
Doing a periodic inspection I have come across a busbar which had limited space around it, so they have terminated SWA into the busbar chamber and run this for no more than 3m to a switch fuse, and then SWA out of the switch fuse.
I do not like this, and without double checking the regs, I think this is actually OK......
Thoughts?
On the same job there are actually a few SWA's terminated directly to the busbar chamber which feed TP boards across the site - no switch fuses installed. These are obviously non compliant.
800amp fuses protecting a busbar, and then 16, 25, 35 mm etc feeding 63amp, 100amp etc switch fuses bushed onto the busbar chamber.
Doing a periodic inspection I have come across a busbar which had limited space around it, so they have terminated SWA into the busbar chamber and run this for no more than 3m to a switch fuse, and then SWA out of the switch fuse.
I do not like this, and without double checking the regs, I think this is actually OK......
Thoughts?
On the same job there are actually a few SWA's terminated directly to the busbar chamber which feed TP boards across the site - no switch fuses installed. These are obviously non compliant.