Down our road we are having a nice new yellow plastic gas main. They have now pretty much finished. However last night I saw my new connection and wondered if it was suitable
The old steel pipe was around 2" dia yet the new one seems about 20mm
Is this correct as I wondered if with a gas cooker and combi boiler on it may not be able to supply the demand?
This picture shows they have reduced the internal dia by inserting one pipe into the steel and a reducing connector for the new section. Thereby I guess it is a good 30% smaller
Any thoughts most welcome.
Richard
The old steel pipe was around 2" dia yet the new one seems about 20mm
Is this correct as I wondered if with a gas cooker and combi boiler on it may not be able to supply the demand?
This picture shows they have reduced the internal dia by inserting one pipe into the steel and a reducing connector for the new section. Thereby I guess it is a good 30% smaller
Any thoughts most welcome.
Richard