Quick question on fire regs.- can't see anything in Approved Doc B.
Client has two large typical late-Victorian semis both currently in flats and being re-furbished. The party wall finishes at ceiling level to the 2nd floor and does not carry up to underside of roof (ie roof void in both houses completely open).
Client wants to separate them for prevention of fire spread. Builder doesn't want to hump concrete blocks up there, so would a stud partition with 'Fireline' each side to 30 mins do?
(Sound transmission Part E not applicable).
Thanks.
Client has two large typical late-Victorian semis both currently in flats and being re-furbished. The party wall finishes at ceiling level to the 2nd floor and does not carry up to underside of roof (ie roof void in both houses completely open).
Client wants to separate them for prevention of fire spread. Builder doesn't want to hump concrete blocks up there, so would a stud partition with 'Fireline' each side to 30 mins do?
(Sound transmission Part E not applicable).
Thanks.