I have planning and building reg approval for a 3m extension into my garden from the the livingroom
Since having builders in, they are telling me it would be ideal and worthwhile to make the existing kitchen at the front of the house into a bathroom and move the kitchen into the back of the garden, this means extending 5m rather then 3m.
When i speak with architect he says it not possible to extend 5m as council will not allow, is he telling me the truth? what is the process for me to change the length of the extension? and finally would i need to tell the planners/councils if i am moving the kitchen to the back, as the initial drawings just had power points, now i would need to take water and gas to the back.
Any input is appreciated.
Horun
Since having builders in, they are telling me it would be ideal and worthwhile to make the existing kitchen at the front of the house into a bathroom and move the kitchen into the back of the garden, this means extending 5m rather then 3m.
When i speak with architect he says it not possible to extend 5m as council will not allow, is he telling me the truth? what is the process for me to change the length of the extension? and finally would i need to tell the planners/councils if i am moving the kitchen to the back, as the initial drawings just had power points, now i would need to take water and gas to the back.
Any input is appreciated.
Horun