Hi,
Is there any reason I can't use an existing run of 10mm twin/Earth for an electric towel rail. An electric shower has been removed but I'm thinking, rather than running a spur off the ring, I can just use the existing 10mm run but change the MCB to a 3amp instead.
Is there anything in the regulations to say that this shouldn't be done?
Thanks.